Best risk management app for Jira: risk register apps compared
Seven risk apps for Jira Cloud and a native Risk work type compared: risk matrices, residual risk, heat maps, Confluence, history, hosting, price and installs.
Appbox makes Risk Register for Jira, one of the apps covered here.
There is no single best risk management app for Jira; there is a best fit for how strict your risk process is. This comparison covers the most-installed risk register apps for Jira Cloud, plus Risk Register for Jira from Appbox and a Risk work type built with Jira alone. Every fact comes from each app’s Marketplace listing, documentation or pricing, checked on November 23, 2026.
The short version: ProjectBalm’s Risk Register is the most installed and the most reviewed. SoftComply’s two apps bring templates for regulated work, such as medical devices and ISO 27001. BOJA’s Risk Register is the one to pick if risks must live in Confluence pages too. Appbox’s Risk Register for Jira covers matrix, residual risk, heat maps and history for the lowest price here from 11 up to 5,000 users.
The apps in this comparison
- Hedge, from Appfire: risk registers across projects, with four risk frameworks to start from. Docs.
- Risk Radar for Jira, from TypeSwitch: a quick score for each work item from three fixed questions. How it scores.
- Risk Register, Risk Management for Jira & Confluence, from BOJA Technology: risk registers in Jira and Confluence. Docs.
- Risk Register, from ProjectBalm: inherent and residual assessments on risk work items, with risk models per space. Docs.
- Risk Register for Jira, from Appbox, listed on the Marketplace as Risk Analyzer for Jira (Pro): a risk matrix of your own, initial and residual ratings, and reports. Docs.
- SoftComply Risk Manager: a risk table and matrix for product risk, with ISO 14971 and FMEA templates. User guide.
- SoftComply Risk Manager Plus: configurable risk models for product, security and organizational risk. User guide.
Portfolio apps such as BigPicture also include a risk management module; this post sticks to apps built for risk.
Feature comparison
| Configurable matrix | Initial and residual | Heat map | Confluence | History | |
|---|---|---|---|---|---|
| Hedge | Yes. Four frameworks to start from; metrics, levels, score and matrix editable | Yes. Several calculations per register, such as inherent and residual | Yes. Risk matrix with drill-down, plus status and risks-raised charts | Not in its docs | Not in its docs. Since 8.0.0, metrics can sync to Jira fields |
| Jira, no app | Partly. Select fields and an automation rule; no matrix screen | Partly. A second pair of fields | Partly. A gadget counts risks per likelihood and impact pair | Partly. The Jira work items macro lists the register; the Jira Chart macro can’t chart fields of your own | Yes. The History tab records field changes |
| Risk Radar for Jira | No. Fixed likelihood, impact and difficulty, scored 1 to 10 | No | Yes. A likelihood by impact risk matrix tab with difficulty filters and drill-down, plus a green, yellow or red score per work item | No. Not in its docs | Partly. An optional comment when an assessment is saved |
| Risk Register (BOJA Technology) | Yes. Size, labels, colors and definitions; one model per space | Yes | Yes. A matrix and a dashboard gadget | Yes. Risk macros in the same app, editable in Confluence | Yes. A risk log of impact and probability changes, with who and when |
| Risk Register (ProjectBalm) | Yes. Levels with names, colors and descriptions; one model per space | Yes. Residual starts as a copy of inherent | Yes. Count per cell, and a dashboard gadget | Partly. A Jira dashboard with its gadget, added as a Smart Link | Yes. Changes to probability, impact and level, with who and when |
| Risk Register for Jira (Appbox) | Yes. Up to 15 probability, impact and risk levels; you set the level for each pair | Yes. Every risk rated before and after treatment | Yes. Initial and residual heat maps, and risk change over time | No | Yes. Every rating change, who made it and when, with old and new values |
| SoftComply Risk Manager | Yes. 2D models with characteristics, levels and classes you name, up to 10 per space; 3D and score-based models need Plus | Yes. Linked initial and residual matrices | Yes. Initial and residual risk matrices, plus dashboard gadgets | Yes. A free Confluence app with matrix, table and history macros | Yes. Every change to risk values, in history reports, gadgets and a Confluence macro |
| SoftComply Risk Manager Plus | Yes. Your own characteristics, 2D, 3D or RPN models, up to 10 per space | Yes. Assessment rounds you name, such as Initial, Current and Target | Yes. Risk matrix views, 3D included | Yes. The same free app | Yes. Every change to risk values |
Checked on November 23, 2026, against each app’s listing and docs: Hedge, BOJA, ProjectBalm, Appbox, SoftComply’s Confluence app.
Price, installs and rating
Cloud, Standard edition, monthly billing, in US dollars:
| App | 10 users | 50 users | 100 users | 250 users |
|---|---|---|---|---|
| Hedge | Free | $70 | $140 | $273.50 |
| Risk Radar for Jira | $5 | $73.50 | $147 | $283.50 |
| Risk Register (BOJA Technology) | Free | $65 | $130 | $250 |
| Risk Register (ProjectBalm) | $5 | $87.50 | $175 | $317.50 |
| Risk Register for Jira (Appbox) | Free | $35 | $70 | $145 |
| SoftComply Risk Manager | Free | $166.50 | $333 | $468 |
| SoftComply Risk Manager Plus | Free | $220 | $440 | $671 |
| App | Installs | Rating | Runs on Atlassian | Other trust badges and certifications | Stores End-User Data outside Atlassian |
|---|---|---|---|---|---|
| Hedge | 308 | 4.6 of 5 (6 reviews) | No | Atlassian Enterprise Certified; SOC 2 and ISO 27001 | No |
| Risk Radar for Jira | 230 | 5 of 5 (10 reviews) | Yes | None | No |
| Risk Register (BOJA Technology) | 580 | 4.8 of 5 (17 reviews) | Yes | Cloud Fortified | No |
| Risk Register (ProjectBalm) | 2,156 | 4.5 of 5 (48 reviews) | No | Cloud Fortified; SOC 2 | Yes, with no data residency option |
| Risk Register for Jira (Appbox) | 308 | 4.5 of 5 (16 reviews) | Yes | None | No |
| SoftComply Risk Manager | 549 | 4.5 of 5 (14 reviews) | No | Cloud Fortified | No |
| SoftComply Risk Manager Plus | 550 | 4.8 of 5 (12 reviews) | No | Cloud Fortified | No |
Checked on November 23, 2026. Above 10 users, each app charges per user, less per user in larger tiers. A year costs ten times the monthly price for the same user tier, and annual tiers round up, so 250 users pay the 300-user annual price. Above about 5,500 users, SoftComply Risk Manager costs less than Risk Register for Jira. The last column is each listing’s answer on its Privacy & Security tab. Certifications are each listing’s Privacy & Security answers. Atlassian no longer accepts new Cloud Fortified apps and has said it will phase the program out by the end of 2026. ProjectBalm moved its app to Forge in November 2026, and its published plan targets Runs on Atlassian by January 2027. Install counts are the listing’s figure; ProjectBalm and both SoftComply apps also sell Data Center versions, which the count may include.
Where the other apps are stronger
ProjectBalm’s Risk Register has the most installs and reviews by a wide margin. It adds Risk Foundry, a library of risks and treatments to start from, builds registers from spaces or saved filters, and shows its matrix on Jira dashboards. Its risk history records who changed each assessment and when.
SoftComply Risk Manager is built for product risk. Its ISO 14971 hazard analysis and FMEA templates set up the risk table for you, and it exports the risk model and risk table as PDF, or the table as CSV.
SoftComply Risk Manager Plus has the most configurable risk models here: 3D and RPN as well as 2D, characteristics you name, assessment rounds you name, and object registers for items such as controls and assets. It also offers an ISO 27001 checklist and Statement of Applicability export.
BOJA’s Risk Register is the only app here whose Confluence macros let you edit risks from the page, in the same app and on the same data. Its grid works across projects, boards and JQL, and it runs on Atlassian too.
Hedge starts you on one of four frameworks, puts several projects in one register, and drills down from the matrix to the risks in each cell. Its docs don’t cover risk history, Confluence or matrix sizes, so try those in the trial before you rely on them.
Risk Radar is the quickest to start: three questions on a work item give a score from 1 to 10. It suits delivery teams who want a risk flag on stories, not a register with levels of their own.
Where Risk Register for Jira fits
Risk Register for Jira, listed as Risk Analyzer for Jira (Pro), covers the core of a register at the lowest price here from 11 up to 5,000 users:
- A matrix of your own. Name up to 15 probability, impact and risk levels, describe each one, give each risk level a color, and choose the level each pair gives.
- Initial and residual risk on every risk, with an initial and a residual heat map, so you can compare where risks started and where they stand.
- What changed. The risk change over time report shows risks that went up or down in a date range, and each work item’s history lists every rating change.
- Searchable ratings. In company-managed spaces, the ratings are Jira fields, so JQL such as
"Residual Risk" in (High, Extreme)finds risks across spaces.
Where it falls short of the others: no Confluence macro, no FMEA or ISO templates, and far fewer installs than ProjectBalm’s app.
Build a risk register without an app
Jira alone can hold a usable register. It’s the setup people ask about when they want a risk level from likelihood and consequence:
-
Add a Risk work type to your space.
-
Create two single-select fields, Likelihood and Impact, with the options 1 to 5, and a number field, Risk score. Put what each number means in the field descriptions.
-
Create an automation rule with the Field value changed trigger on Likelihood and Impact, and an Edit work item action that sets Risk score with a math expression:
{{#=}}{{issue.Likelihood.value}} * {{issue.Impact.value}}{{/}} -
For residual risk, repeat steps 2 and 3 with Residual likelihood, Residual impact and Residual score.
-
Save a filter such as
type = Risk AND statusCategory != Done. On a dashboard, add the Two Dimensional Filter Statistics gadget with that filter, Likelihood on one axis and Impact on the other. It counts the risks in each pair. -
In Confluence, the Jira work items macro lists the register from the same filter. The Jira Chart macro’s two-dimensional chart only takes fields such as status, priority and assignee, so it can’t draw Likelihood by Impact; Risk matrix in Confluence covers what does.
What you don’t get: colored risk levels in the matrix, a risk level that follows a matrix you define cell by cell, or a register grid to rate many risks at once. Every change does show in the work item’s History.
Which to choose
- Choose Hedge if you want registers that span several projects, set up quickly from a ready-made framework.
- Choose Jira, no app, if you have a few dozen risks, one scale, and no need for a colored matrix.
- Choose Risk Radar if you want a light risk flag on delivery work rather than a formal register.
- Choose BOJA’s Risk Register if risks must be read and edited in Confluence as well as Jira, and you want an app that runs on Atlassian.
- Choose ProjectBalm’s Risk Register if you want the most widely used app, a library of risks and treatments, and a detailed assessment history.
- Choose Risk Register for Jira if you want a matrix of your own, initial and residual heat maps and full history at the lowest price here from 11 up to 5,000 users, with data that stays in Atlassian.
- Choose SoftComply Risk Manager if you manage medical device or product risk and need ISO 14971 or FMEA tables with PDF and CSV exports.
- Choose SoftComply Risk Manager Plus if your framework needs 3D or RPN models, more than two characteristics, or ISO 27001 controls and a Statement of Applicability.
Questions
What is the difference between inherent and residual risk?
Inherent risk, also called initial risk, is the exposure before any treatment or control. Residual risk is what remains after them. Every dedicated app here except Risk Radar rates both.
Can I run a RAID log in Jira?
Yes. Use a work type for each of risks, assumptions, issues and dependencies, or one RAID work type with a Category field, and save a filter for each log. A risk app adds the matrix and scoring to the risk part only.
Do risks need a work type of their own?
Not always. Hedge creates a Risk work type in company-managed spaces when installed. ProjectBalm’s app works on a primary risk work type plus any supplementary ones you choose. BOJA’s and Appbox’s apps can rate any work item.
Can one register cover several spaces?
In most apps, yes. ProjectBalm builds registers from spaces or saved filters, BOJA from projects, boards or JQL, Hedge from several projects, narrowed by work type or JQL, and Appbox loads work items with JQL or a saved filter. Without an app, a filter across spaces does the same.
Keep reading
Try Risk Register for Jira
Keep every risk in Jira. Rate each one on a risk matrix of your own, follow it from initial to residual risk, and give leadership heat maps they can read at a glance.