Jira test execution reports: track test runs and results
What a test execution report needs, how to build runs and reports in Jira with sub-tasks and dashboard gadgets, where that falls short, and what an app adds.
A test execution report answers one question per release: where does testing stand? For every test case in the run, it shows whether it passed, failed, was blocked or hasn’t run yet, how that compares with earlier runs, and which defects the failures turned up. Jira has no test run object, but you can build one from a run work item, a sub-task per case and a few dashboard gadgets.
This guide covers what the report needs, a native setup with real JQL and gadgets, where it falls short, and how a test management app records runs instead.
What a run report needs
| Question | What answers it |
|---|---|
| Where does this release stand? | Counts of passed, failed, blocked and not run cases |
| What exactly failed? | The result for each case, with notes |
| Is quality getting better or worse? | The same counts across runs and releases |
| What did the failures find? | The defects linked to failed cases, and whether they’re fixed |
| Can we trust the result? | Who ran each case, when, and on which environment and build |
“Not run” deserves its own number. A run with 90 passes and 60 cases still to go isn’t a 100% pass rate. It’s 60% done.
Don’t put the result on the test case
It’s tempting to give the test case itself statuses like Passed and Failed. This Community thread shows where that leads: a case sitting in Ready for Testing might have failed, or might never have run, and the board can’t say which. A test case runs many times, in different releases and environments, so its result belongs to the run, not to the case.
Build runs from sub-tasks
1. Set up the work types and the workflow
You need three work types:
- Test: the test case, written once and reused.
- Test run (some teams call it Test Execution): a standard work type, one per run, such as “Regression 2.4.0”.
- Test result: a sub-task work type, one per case per run.
If you don’t have a Test work type yet, add one first. In a company-managed space, a Jira admin adds the other two under Settings > Work items > Work types > Add work type, choosing standard for Test run and sub-task for Test result, then adds both to the space’s work type scheme. Team-managed spaces can’t have custom sub-task types, so use the built-in Subtask type there.
Give the result sub-task a workflow with four statuses: Not run in the To Do category, Blocked in In Progress, and Passed and Failed in Done. With that split, statusCategory != Done lists what’s still left in a run.
2. Make a template run
Create a Test run called “Regression template” with one sub-task per regression case. Start each sub-task’s summary with the case key, as in “QA-21 Guest pays with a card”, so every result points back to its case.
3. Start each run by cloning
- Open the template, select ••• > Clone, name the copy “Regression 2.4.0”, and include its subtasks.
- Set the run’s Fix versions to the release.
- Search for its results, such as
parent = QA-500, select ••• > Bulk change work items, and set the same Fix versions on every result. The comparison across releases depends on it.
4. Record the results
Testers move each result to Passed, Failed or Blocked, and comment on anything that isn’t a pass. For a failure, select Add > Linked work item, then Create linked work item to raise a Bug linked to that result, and give the Bug the release’s Fix versions too.
Report on runs with dashboard gadgets
Save these searches as filters. QA is the space key and 2.4.0 the release; in a team-managed space, use type = Subtask instead of type = "Test result".
This release’s results:
project = QA AND type = "Test result" AND fixVersion = "2.4.0"
Every result, across releases:
project = QA AND type = "Test result"
What failed or is blocked:
project = QA AND type = "Test result" AND fixVersion = "2.4.0" AND status in (Failed, Blocked) ORDER BY status ASC
Open defects for the release:
type = Bug AND fixVersion = "2.4.0" AND statusCategory != Done
Then build a dashboard from Jira’s gadgets:
- Pie Chart on the first filter, with Status as the statistic type: the run at a glance.
- Two Dimensional Filter Statistics on the second filter, with Status on the x-axis and Fix versions on the y-axis: a row per release, so releases sit side by side.
- Filter Results on the third filter: the failures and blocks, with their assignees.
- Filter Results on the defect filter, to list what is still open. For Created vs Resolved, save one more filter without the status clause,
type = Bug AND fixVersion = "2.4.0", to see whether bugs are being fixed as fast as they’re found.
Where the native report falls short
- No pass rate of what ran. The Pie Chart shows Passed as a share of every result, so cases still to run pull it down. A rate over the cases that ran is arithmetic you do yourself.
- The case doesn’t know its last result. To find when QA-21 last passed, you search every run’s results for its key.
- Re-runs overwrite. Run a failed case again after the fix and the sub-task’s status changes. The first failure survives only in the work item’s history.
- Trend by release, not by date. The two-dimensional table compares releases; nothing charts the pass rate week by week.
- Work item sprawl. A 200-case regression pack adds 200 sub-tasks to every run.
- No environment or build on a result, unless you add fields for them.
- Upkeep. Cloning, bulk changes and case keys typed into summaries all depend on someone remembering.
Track runs and reports with Advanced Test Management
Advanced Test Management for Jira records each run as a Test Execution, so reports read from runs instead of from statuses someone moved:
- Runs from cases, sets or plans. Start an execution from ticked cases, a Test Set or a Test Plan. The runner shows each case’s preconditions and steps, with Pass, Fail, Blocked and Skip buttons, a notes box, and one Environment / build for the whole run. Keys 1 to 4 mark the current case.
- An overall result per run. On the Executions tab, any failure makes the run a Fail; otherwise any blocked case makes it Blocked, and it’s a Pass only when every case passed or was skipped. Runs posted by CI sit alongside manual ones.
- A latest result on every case, shown on the case itself and in reports.
- Reports built from runs. The Reports tab includes an Overview with pass rate and coverage, an Execution trend by day, week or month with a pass-rate line, Plan execution summary and Plan burndown for release readiness, Environment × build, Failing & at-risk, Flaky tests and Defects.
- A dashboard gadget. Add the app’s gadget, choose the space (the gadget calls it Project) and a report, and save. In a company-managed space it shows a summary by default, and most of the Reports tab is available in it.
Make the report something people read
- Report “not run” next to “failed”. A release where half the cases haven’t run isn’t ready, however green the rest looks.
- Keep blocked apart from failed. Blocked usually points at an environment or a dependency, not at the feature under test.
- Watch the rate, not the counts. More tests mean more failures; the pass rate tells you whether quality changed.
- Use the same environment names everywhere. “staging” and “Staging” split one environment in two in any report that groups by it.
- Put the dashboard where the release decision happens, and close the loop: every failed result should end in a Bug, or in a note saying why not.
Questions
Can a test case’s status show its last result?
Not reliably. A test case runs many times, in different releases and environments, so one status keeps getting overwritten and the history is lost. Keep results on the run, not on the case.
What’s the difference between failed and blocked?
Failed means the test ran and the product didn’t do what was expected. Blocked means the test couldn’t run, often because of an environment problem or another bug, so it says nothing about the feature yet.
How do I show a pass rate on a Jira dashboard?
Jira’s Pie Chart shows each status as a share of all results, cases not yet run included. For a pass rate of what actually ran, divide passed by passed, failed and blocked yourself. Test management apps work the rate out for you.
Should automated and manual results share one report?
Yes, when they cover the same release, but keep them distinguishable, with a label or a field. Otherwise hundreds of automated passes can hide a manual run that has barely started.
Keep reading
Try Advanced Test Management for Jira
Write, organize and run your tests in Jira, right next to the work items they verify. Link every test case to its requirement, record every run, and see what’s covered and what’s failing at a glance.