How to calculate an ICE score in Jira

An ICE score rates Impact, Confidence and Ease to rank ideas fast. The scales, multiplying or averaging, a worked example, and how to score ICE in Jira.

An ICE score ranks Jira issues by three ratings: how much an item will help (Impact), how sure you are that it will (Confidence), and how easy it is to do (Ease). It takes minutes, which is why growth teams and teams on young products like it. Jira doesn’t come with ICE set up.

This guide covers the scales, whether to multiply or average, when ICE beats RICE and when it misleads, a worked example, and how to calculate an ICE score in Jira with an automation rule or with an app.

What ICE measures

ICE is usually credited to Sean Ellis, who used it to rank growth experiments. Each item gets three ratings, most often from 1 to 10:

  • Impact: how much the item moves the one metric you care about right now, such as trial-to-paid conversion.
  • Confidence: how sure you are that it will. This is a judgment about evidence, not enthusiasm.
  • Ease: how little work it takes. Ease is effort turned upside down: 10 is a quick change, 1 is months of work.

A 1 to 10 scale only works if everyone reads it the same way, so write the levels down before anyone scores. For example:

Rating Impact Confidence Ease
9 to 10 Moves the metric a lot Results from a test or a launch Hours
6 to 8 A clear, measurable lift Strong signals, such as many requests Days
3 to 5 A small lift Some customer feedback Weeks
1 to 2 Hard to measure An opinion or a hunch Months

Tying Confidence to the kind of evidence, rather than to how strongly someone feels, is what keeps ICE honest.

Multiply or average the ratings

Both versions are in use:

ICE score = Impact × Confidence × Ease           (1 to 1,000)
ICE score = (Impact + Confidence + Ease) ÷ 3     (1 to 10)

Multiply. The point of ICE is that a weak rating in any of the three should hold an item back. Averaging lets one rating make up for another: an idea rated 10, 2 and 9 averages 7, the same as a solid 7, 7 and 7. Multiplied, the long shot scores 180 and the solid idea 343.

Multiplying also spreads the scores out, so ties are rare. The cost is that a one-point change can move an item a long way, which is one more reason to write the scale down.

Average only if your team rates rough guesses at speed and wants a gentler spread. Adding the three gives the same order as averaging. Whichever you choose, use it for every item, and never compare a multiplied score with an averaged one.

A worked example

Five onboarding ideas for a SaaS product, rated by the product manager, designer and tech lead in one session:

Idea Impact Confidence Ease I × C × E Average
Google sign-in on the signup page 6 8 8 384 7.3
In-app setup checklist 7 6 7 294 6.7
Shorter trial reminder emails 4 7 9 252 6.7
AI summary of weekly activity 10 2 9 180 7.0
Usage-based pricing plan 9 4 2 72 5.0

Multiplied, the order is clear: Google sign-in, then the checklist, then the emails. The AI summary claims the biggest impact, but nobody has evidence for it, so it lands fourth. Averaged, it would rank second, ahead of two ideas the team actually believes in, and the checklist and the emails would tie.

The AI summary’s low score isn’t a no. It says: raise Confidence first, with a quick test or a few customer calls, then rate it again.

When ICE beats RICE

RICE adds Reach and divides by Effort. ICE is the better fit when:

  • You need an order today. Three quick ratings per item, no data to pull. A team can rate twenty ideas in one meeting.
  • The items reach about the same people. If every idea touches the same signup flow, Reach would be the same number for each and change nothing.
  • The product is young. Without usage data, Reach is a guess anyway, and Confidence makes the guessing visible.

When ICE misleads

  • Everything is an opinion. Favorite ideas drift up to 8s, and the loudest voice sets Confidence.
  • No Reach. An item that helps 20 customers a lot can outscore one that helps 2,000 a little. When audiences differ, use RICE.
  • Ease is coarse. A month of work and a year can both end up as a 1 or a 2, so ICE barely tells big jobs apart. If job sizes vary widely, a method that divides by size, such as RICE or WSJF, handles it better.
  • Ratings from different sessions don’t mix. Last quarter’s 7 isn’t today’s 7. Rate a list together rather than adding to it piecemeal.

Score ICE in Jira with automation

Jira can work out the score with number fields and one automation rule.

  1. Create four number fields, Impact, Confidence, Ease and ICE score, and add them to the work types you score. Put your written scale in each field’s description. If Jira Service Management has already added an Impact field to your site, name yours ICE impact instead, and use that name below, because two fields with one name confuse JQL.

  2. Create an automation rule with the Field value changed trigger. Watch Impact, Confidence and Ease, and add ICE score too. By default a rule’s own edits don’t set off rules, so it can’t loop, but anyone typing over the score sets it off and the score is put back.

  3. Add a JQL condition that also checks the range, so a stray 0 or 50 never produces a score:

    Impact >= 1 AND Impact <= 10 AND Confidence >= 1 AND Confidence <= 10 AND Ease >= 1 AND Ease <= 10
  4. Add the Edit work item action and set ICE score with a math expression:

    {{#=}}{{issue.Impact}} * {{issue.Confidence}} * {{issue.Ease}}{{/}}

    To average instead, with one decimal place:

    {{#=}}ROUND(({{issue.Impact}} + {{issue.Confidence}} + {{issue.Ease}}) / 3, 1){{/}}
  5. Save a filter that ranks what’s been scored, and open it as a list or add it to a dashboard:

    project = GROW AND "ICE score" is not EMPTY AND statusCategory != Done ORDER BY "ICE score" DESC

Step 2 answers the follow-up raised in this Atlassian Community question about an ICE rule: what happens when someone types over the calculated score. If your Jira has the Formula field type, a formula field such as {Impact} * {Confidence} * {Ease} can do the math instead of a rule.

Where it falls short

  • The scale lives in a description. A number field takes 0, 11 or 7.5. The JQL condition skips an out-of-range rating, but the old score stays and nobody is told.
  • A blank rating means no score, and step 5’s filter quietly leaves the item out. Clear a rating later and the old score stays. A second filter for "ICE score" is EMPTY shows what still needs rating.
  • Rating a list is slow. ICE is quickest when you go down a list in one pass, and editing three fields work item by work item isn’t that.
  • No reasons. Each work item’s History tab shows who changed a rating, but not why, and there’s no view of how the ranking moved.

Score ICE with Backlog Prioritization

Backlog Prioritization for Jira has ICE as one of its ready-made methods, worked out as Impact × Confidence × Ease, as its ICE page explains:

  • One scale for everyone. Impact, Confidence and Ease are metrics with values of their own, so everyone rates on the same scale. You can change the values to match your written levels. The defaults are the app’s own, not 1 to 10: Impact and Confidence run from 1 to 13 and Ease from 1 to 20, so scores go up to 3,380. Change the values to 1 to 10 if you want scores like the example above.
  • A whole list in one pass. Load the items with a basic search, JQL or a saved filter, and rate them in the grid. The score works itself out as you go, shaded darker the higher it climbs.
  • Averaging, if you prefer it. The method’s formula can be edited like any other. Decide before your first session: changing the formula of the method in use resets the space’s scores.
  • A score Jira can use. Score is a Jira field: search it with JQL and rank with Score is not EMPTY ORDER BY Score DESC, so work items not yet rated don’t sort to the top.
  • History and a matrix. Each work item’s Backlog Prioritization History tab lists its 50 most recent rating and score changes made on the grid or in the work item, with who made each one, when, and the value before and after. Changes made with Bulk Edit Metrics aren’t listed. The matrix report plots any two metrics, such as Impact against Ease.

Tips for honest ICE scores

  • Say the evidence out loud when you rate Confidence, and match it to your written levels.
  • Rate one column at a time across the list, so each rating is compared with its neighbors.
  • Treat high Impact with low Confidence as a test to run, not an idea to drop.
  • Rate again when you learn something, such as a test result or a new estimate.
  • Keep the board ranked by hand. Use the ICE list to decide the order, and drag the board to match.

Questions

Is ICE just RICE without Reach?

Close. Both weigh impact and confidence, but RICE adds Reach and divides by Effort, while ICE multiplies by Ease. RICE’s Confidence is usually a percentage; ICE’s is a 1 to 10 score like the other two.

Should ICE use a 1 to 10 or a 1 to 5 scale?

1 to 10 is the usual scale and spreads scores out more. 1 to 5 is quicker to agree on. Either works if every item uses the same one, with each level written down.

Who should give the ICE scores?

The people closest to the evidence: product or data for Impact, engineering for Ease, and whoever ran the research or test for Confidence. One person scoring everything tends to favor their own ideas.

How do I sort a Jira board by ICE score?

Add "ICE score" is not EMPTY and ORDER BY "ICE score" DESC to a saved filter, as in step 5, and open it as a list. On a company-managed board you can put it in the board’s filter instead, but drag-and-drop ranking then stops working on that board.

Try Backlog Prioritization for Jira

Score every issue the same way, with RICE, ICE, WSJF or a formula of your own, and rank the whole backlog on one grid. The score is a Jira field, so boards, filters and JQL can sort by it.