Acceptance criteria checklists in Jira
Write acceptance criteria people can tick off, with examples for four kinds of stories, where to keep them in Jira, and how to require them before Done.
Acceptance criteria are the conditions one story has to meet before the product owner accepts it. They work best as a checklist: short statements that each pass or fail, which someone other than the developer can verify.
This guide covers how to write criteria that can be checked, with examples for four kinds of stories, where to keep them in a Jira work item, how to make them required before Done, and how to review them in refinement.
What makes acceptance criteria checkable
A criterion can be checked when:
- It covers one thing. “Users can export and filter invoices” is two criteria.
- It passes or fails. There’s no “mostly” or “nearly”.
- Someone else can verify it from the product, without reading the code.
- It uses numbers, not adjectives. “In under 10 seconds”, not “quickly”.
| Vague | Checkable |
|---|---|
| The export is fast | An export of 5,000 invoices finishes in under 10 seconds |
| Works on mobile | The form fits a 360px-wide screen without scrolling sideways |
| Handles errors | If the card is declined, the customer sees the bank’s reason and keeps their cart |
| Secure | Only account owners and admins see the Export CSV button |
Rule lists or Given/When/Then
Most teams use one of two formats, and many mix them.
- A rule list is a set of statements that must all be true. It’s quick to write and to read, and it suits most stories: screens, reports, settings and permissions.
- Given/When/Then describes a scenario: a starting state, an action and the outcome. It comes from behavior-driven development and suits flows where order and state matter, such as sign-up, payment or approval. Teams that automate tests in Gherkin can turn each scenario into a test.
As a checklist, each rule or each scenario is one item.
Acceptance criteria examples
A feature with rules: export invoices
As an account owner, I want to export my invoices as a CSV file, so I can reconcile them in my accounting software.
- Account owners and admins see an Export CSV button on the Invoices page; other roles don’t
- The file has one row per invoice, with the invoice number, date, amount, currency and status
- The date filter on the page applies to the export
- Amounts use a dot as the decimal separator, whatever the user’s language
- The file name includes the export date, as invoices-YYYY-MM-DD.csv
- An export of 5,000 invoices finishes in under 10 seconds
- With no invoices in the date range, the button is disabled, and its tooltip says why
A flow with Given/When/Then: password reset
As a customer who forgot my password, I want to reset it by email, so I can get back into my account.
Given a customer with a verified email address
When they request a password reset
Then they receive an email with a reset link within 2 minutes
Given a reset link older than 30 minutes
When the customer opens it
Then they see "This link has expired" and a button to request a new one
Given a customer who has just reset their password
When they sign in with the old password
Then sign-in fails
One rule completes the list: a reset requested for an unknown email address shows the same message as one for a known address, so the page doesn’t reveal who has an account.
An integration: send customer requests to the CRM
As a sales lead, I want new customer requests from Jira to appear in our CRM, so the account team sees them.
- Work items labeled customer-request appear in the CRM within 5 minutes of being created
- Each CRM record links back to its work item
- Editing the work item updates the CRM record instead of creating a second one
- If the CRM is down, the sync retries for an hour, then adds a comment to the work item
- No passwords or payment details are sent to the CRM
A design change: the checkout summary
As a shopper, I want a clearer order summary at checkout, so I know what I’ll pay before I confirm.
- Matches the approved design on desktop and mobile
- Subtotal, discounts, shipping, tax and total each have their own line
- Totals match the old summary for the 20 saved test carts
- Every control works with the keyboard alone, with a visible focus outline
- Text contrast is at least 4.5:1, the WCAG AA level for body text
- The summary fits a 360px-wide screen without scrolling sideways
Where to keep acceptance criteria in Jira
In the description
Add a heading such as Acceptance criteria, and type each criterion as an action item: [] and a space turns a line into a checkbox. It needs no setup, and everyone who opens the work item sees it. But the criteria sit among other notes and can be edited away unnoticed, and nothing outside the description can see which boxes are ticked: not JQL, not workflows, not automation.
In a paragraph field
A Jira admin creates a Paragraph custom field called Acceptance criteria (Settings > Work items > Fields > Create new field) and adds it to the story screens. The criteria stay apart from the rest of the description, a workflow can require the field, and JQL finds stories without any:
project = SHOP AND type = Story AND "Acceptance criteria" is EMPTY
The field is still one block of text, though. Jira can require that it’s filled in, not that each criterion has passed.
In a checklist
Each criterion becomes an item that can be ticked, required and counted. That’s what a checklist app adds. A Checkboxes custom field doesn’t work here: an admin sets its options for a whole space or work type, and acceptance criteria are different for every story.
| Description | Paragraph field | Checklist app | |
|---|---|---|---|
| Setup | None | An admin adds the field | An app, set up once |
| Kept apart from other notes | No | Yes | Yes |
| Each criterion required before Done | No | No | Yes, in company-managed spaces |
| JQL finds unfinished criteria | No | No | Yes |
Make acceptance criteria required
Jira can enforce two things natively, both in company-managed spaces.
Criteria before work starts. Require the Acceptance criteria field on the transition into In Progress:
- Go to Settings > Work items > Workflows and edit the story workflow.
- Select the transition into In Progress.
- Under Validate details, add a Validate a field rule that requires Acceptance criteria.
- Select Update workflow.
A sign-off before Done. Create a Checkboxes field called Criteria verified, with a single option, Verified by product owner. On the transition into Done, add a Validate a field rule that requires it. With only one option, any value means the box was ticked. In a team-managed space, add a Restrict to when a work item is a specific value rule to the transition into Done instead: Criteria verified contains Verified by product owner.
Both stop a story from moving without someone taking responsibility. Neither checks the criteria themselves: one tick covers all of them, whether each one passed or not.
Review acceptance criteria in refinement
Before the session, list the stories that need criteria, such as everything in the backlog without them:
project = SHOP AND type = Story AND sprint is EMPTY AND statusCategory != Done AND "Acceptance criteria" is EMPTY
In the session:
- Read each criterion and ask how you’d test it. If nobody can say, rewrite it.
- Replace adjectives with numbers. “Fast” becomes a time, “large” becomes a size.
- Split stories with too many criteria. Past eight or so, a story is usually two.
- Note what each criterion needs. Test data, a design or an answer from another team.
- Agree who verifies. Usually the product owner, sometimes QA.
Before planning, check the next sprint: project = SHOP AND sprint in futureSprints() AND type = Story AND "Acceptance criteria" is EMPTY should return nothing.
Track acceptance criteria with Checklist for Jira
Checklist for Jira makes each criterion an item on the story’s checklist:
- Required criteria. In a company-managed space, mark the criteria that must pass as mandatory (the * beside each item) and add the All mandatory checklist items are completed validator to the transition into Done. The story can’t close with a required criterion open. The validator isn’t offered in team-managed spaces. See Block issue transition using checklist validators.
- Standard criteria on every story. A template assigned with
type = Storyloads the criteria every story shares, such as accessibility checks, in their own tab or section, the first time someone opens the story’s checklist. A story whose checklist nobody has opened has none yet, and the validator lets it through. See Assigning templates. - A status for each criterion. Mark one Blocked and say why in its description (a space admin turns descriptions on with Enable Item Description in the space’s Checklist settings), instead of leaving it unticked with no explanation.
- Progress in JQL.
sprint in openSprints() AND "Mandatory Items Remaining" > 0lists the stories in the sprint with required criteria still open. See Checklist custom fields.
Draft criteria with AI Agents for Jira
AI Agents for Jira can write the first draft. Its Acceptify agent reads a work item’s description and context and drafts acceptance criteria, following your guidelines, level of detail and approximate number of criteria, then adds them to the description as action items, under an Acceptance criteria heading or inside an expand block. To require them before Done, move them into the story’s checklist. The app sends the work item’s details to OpenAI to write the draft, so check that fits your data policy. Treat the draft as a starting point for refinement, not a replacement for it.
Common mistakes
- Describing the solution instead of the outcome. “Use a modal” is a design choice; “The customer confirms before the order is placed” is a criterion.
- Restating the story. “The user can export invoices” adds nothing the story didn’t say.
- Ticking what nobody checked. A tick should mean someone verified it, not that the code was merged.
- Treating a filled-in field as done. Atlassian’s article on making a field required before closing a work item shows the limit: the validator only stops the move when the field is empty. A required field only proves someone typed something, and the same goes for acceptance criteria.
Questions
How many acceptance criteria should a story have?
Enough to cover what was asked, often three to eight. A story that needs many more is usually two stories.
Who writes acceptance criteria?
The product owner usually drafts them, and the team sharpens them in backlog refinement, before the story enters a sprint.
Are acceptance criteria the same as test cases?
No. A criterion says what must be true, and a test case gives the steps and data that prove it. One criterion often needs several test cases.
Can acceptance criteria change during a sprint?
Only if the product owner and the team agree. Treat it as a change of scope: note it in the work item, and re-estimate if the story grows.